Division 2 - Site Work
     Section 02500 - Storm Drainage
          3.01 H


image 7: Dewatering procedures in a deep excavation.

The image shows a deep cistern constructed with a galvanized steel pipe, backfilled with crushed stone. The dewatering procedure facilitated placing the footing and pier, in the foreground, in a dry excavation.


Division 2
Page 4 


Previous Page


Title Page


Table of Contents


Next Page

Copyright ©2001 _____________
URL: http://__________________/D2-4.htm