Division 2 - Site Work
Section 02500 - Storm Drainage
3.01
H
image 7: Dewatering
procedures in a deep excavation.
The image shows a deep cistern constructed with a galvanized steel pipe, backfilled with crushed stone. The dewatering procedure facilitated placing the footing and pier, in the foreground, in a dry excavation.
Division 2
Page 4
Copyright ©2001
_____________
URL:
http://__________________/D2-4.htm