Division 1 - General Requirements
      Section C - Special Conditions
           1C - 16 Temporary Fencing


image 4: Temporary fencing (site protection).

The image shows the construction fence, which must encircle the entire site with appropriate signage and notification to vehicular and pedestrian traffic. It is the Contractor's responsibility to maintain not only the fence throughout the entire construction process, but also the safety of the public in and around the perimeter of the building site. This includes but is not limited to: traffic flow, sidewalks, environmental protection, site security, flagman, construction parking and staging. It is also the contrator's responsibility to maintain existing facilities of the municipality, town, or village which might be affected by construction procedures.