Division 1 - General
Requirements
Section
C - Special Conditions
1C
- 10 Temporary Heat
image 7: Temporary protection for
temporary heat maintenance.
The image shows a plastic and plywood sheet assembly enclosing a loading dock opening prior to the installation of the overhead doors. The temporary closure assembly facilitates the Contractor's responsibility for maintaining temporary heat to properly protect all work and materials against damage by dampness and cold, dry out the work, and maintain critical installation temperatures for all trades.
Division 1
Page 6
Copyright ©2001
_____________
URL:
http://__________________