Division 1 - General Requirements
     Section C - Special Conditions
          1C - 10 Temporary Heat


image 8: Temporary protection.

Image 8 is taken at the main entry to the building. It shows a temporary plywood door and closure at the building entry prior to the installation of the finished glass doors. Along with providing temporary closure, the plywood doors also facilitate the Contractor's responsibility to provide undamaged surfaces and systems to the Owner which is a standard of all contractual agreements.